Projects

Following is brief example of the experience of Sbarra Construction West, Inc. and Mr. Sbarra:

Max’s Wine Dive, Denver, CO

SCW, Inc. provided General Contracting services for Max’s Wine Dive in Denver, CO.  Work included removing two load bearing brick walls in the 100 year old structure and installing new concrete piers and steel moment frames.  Finish work included new full service kitchen, exterior grease trap, restroom core and finishes, bar and serving area, new flooring and wood finishes as well as grease hoods, electrical and plumbing.  Completed May 2015.

Max Front (2)   Max overall   Max Kitchen 2

Max bar 2   Max dining   Max bar

Thrive Business Solutions, Denver, CO

SCW, Inc. served as General Contractor for the 10,000 sf interior build out of the 100 year old building for new co-working space.  Work consisted of new bathroom cores and finishes, new water and electrical service, acoustical ceilings, walls, and kitchenette.  Areas include work areas, entrance lobby and front desk, group co-working office space and bar.  Completed June 2015.

Thrive Main   Thrive Exterior   Thrive Bar

St. Patrick Kitchen and Lower Level Remodel, Colorado Springs, CO

As the General Contractor, SCW, Inc. demolished the existing interiors in the 12,000 sf basement to provide a new, larger kitchen, daycare area and social hall.  An exterior patio and barbecue area were also constructed.  Work consisted of installation of a 1,500 gallon grease interceptor, exterior pavers, drystack barbecue grill, grease hoods and duct, new ceilings and floorings throughout, new bathrooms, all power and lighting.  New condenser and air conditioning coils were added to the existing system to provide cooling throughout.  Completed September 2014.

DSCN0815    DSCN0783   DSCN0845

20 Mile Gymnastics, Parker, CO

SCW, Inc. provided CM/GC services for a 14,000 sf gymnastics studio tenant interior finish. Work included new 2,200 sf office, reception, locker room, and bathroom area.  New tenant electrical service and gear, lighting, and hvac systems throughout.  Completed February 2013.

20 mile 1          20 mile 3          20 mile 2

 

Catholic Pastoral Center, Colorado Springs, CO

SCW, Inc. was the General Contractor for the renovation of three floors of existing bathrooms and partial hallways in the Catholic Pastoral Center in Colorado Springs.  The building was fully occupied during construction, requiring multiple phases and close coordination with the Owner.  Complete demolition and rebuild of all construction areas.  Completed January 2013.

cpc 1             cpc 2              cpc 3

 

Heritage College, Oklahoma City, OK

Heritage College – Mr. Sbarra served as Construction Manager/Project Manager for a 40,000 sf renovation of an existing building into a new educational facility for Heritage College.  Build out includes administrative office areas, classrooms, simulated operating room, fully functional x-ray rooms, spa areas, student lounge and reception areas.

her 3                her 1              her 2

 

St. Francis of Assisi Catholic Church, Castle Rock, CO

Owner’s Representative for the new 20,000 sf worship space.  Project consists of post tensioned slab on grade, glue laminated wood beam construction, interior finishes, alter and pews.   Assisted during construction and post construction processes.  Completed October 2011.

sf 3               sf 2              sf 1